Developer Walks Away From Estimates
PM: Hey are these time estimates accurate? Dev:
A project manager asks whether the developer’s time estimates are accurate. The suited man turns, gives an awkwardly cheerful look, and slowly walks away, implying the estimates are obviously unreliable or the developer refuses to discuss them. It is used as a reaction to unrealistic deadlines, overpromising, or avoiding accountability.
- @gentoomemes / 11812 2024-06-13
- Type
- video, 0:12
- Size
- 720×790 · 321.7 KiB
- Mood
- sarcastic, awkward
- Language
- en
- Added